Ground Water (RWS.2)

Overview
  • Methods of Developing Sources of Ground Water (RWS.2.M)
  • Planning How to Use Sources of Ground Water (RWS.2.P.1)
  • Selecting a Method of Well Construction (RWS.2.P.2)
  • Selecting a Well Site (RWS.2.P.3)
  • Maintaining Well Logs (RWS.2.C.6)
  • Testing the Yield of Wells (RWS.2.C.7)
  • Finishing Wells (RWS.2.C.8)
  • Disinfecting Wells (RWS.2.C.9)
  • Dug Wells
  • Designing Dug Wells (RWS.2.D.1)
  • Constructing Dug Wells (RWS.2.C.1)
  • Driven Wells
  • Designing Driven Wells (RWS.2.D.2)
  • Constructing Driven Wells (RWS.2.C.2)
  • Jetted Wells
  • Designing Jetted Wells (RWS.2.D.3)
  • Constructing Jetted Wells (RWS.2.C.3)
  • Bored or Augered Wells
  • Designing Bored or Augered Wells (RWS.2.D.4)
  • Constructing Bored or Augered Wells (RWS.2.C.4)
  • Cable Tool Wells
  • Designing Cable Tool Wells (RWS.2.D.5)
  • Constructing Cable Tool Wells (RWS.2.C.5)